Installation of the 22-kilometer, 16-inch diameter line is planned for November, and the contract award once again reinforces Allseas’ ability to take on complex pipelay projects with fast-track planning and execution scopes.
Running at a water depth of 60–70 meters, the pipeline will tie back from a new installation to an existing installation. The scope includes mattress installation and pre- and post-lay surveys.