Drawing on deep subsea engineering and flow assurance expertise, Wood will support COOEC to design an optimized solution for the field’s complex pipeline network to enhance production capacity and extend asset life. Wood will undertake the design of 25 pipelines, including ensuring safe interaction where pipelines cross existing infrastructure and managing thermal expansion to protect long-term integrity, alongside crossing analysis for 15 umbilicals and two power cables.
Gerry Traynor, Regional President – Middle East, Africa & Caspian, at Wood, said: “Wood has a strong track record in delivering offshore detailed design and in optimizing installation solutions for complex subsea systems. By working collaboratively with COOEC, we are bringing together complementary strengths that will help accelerate QatarEnergy’s ambition to extend the field’s life, increase capacity, and boost production from these critical, aging assets.”
Wu Zhixing, Deputy Director of COOEC Engineering Company, said: “COOEC is glad to be QatarEnergy’s trusted partner for the Bul Hanine EPIC2 Project. This is an important milestone which will build on our continual strong track record in the industry, strengthens our presence and commitment to support the energy landscape in the Middle East, and a testament of COOEC’s capability in delivering a trusted EPIC solution for mega offshore projects.”
This award builds on Wood’s previous involvement in Bul Hanine, where the company successfully delivered Pre-FEED and FEED directly for QatarEnergy.