Mr. Ellingsen will assume the role of CEO at Mooreast on January 1, 2025. He will be taking over from Mr. Sim Koon Lam, the Founder, who will continue to serve as Executive Director and Deputy Chairman of the Group.
Mooreast is a total mooring solutions specialist and Asia’s only ultra-high power anchor manufacturer primarily serving the offshore renewable energy, offshore oil & gas, and marine industries. With operations in Singapore and the Netherlands, the Group is establishing a manufacturing facility in Aberdeen, Scotland, and is making forays into the Northeast Asia market.
In June 2024, the Group announced that it was acquiring 60 Shipyard Crescent from a subsidiary of Seatrium Limited. The acquisition increases Mooreast’s total land area to 129,609 sqm (approx. 1.4 million sqft) and quadruples its production capacity to produce enough subsea foundation to support between 1.5 gigawatts (GW) to 2 GW of floating offshore wind energy per annum compared to its current capacity of 0.5 GW.
Mr. Ellingsen, who is also a resident of Singapore, brings over 35 years of experience to the role. He is currently serving as Director of Offshore Wind in the Asia Pacific at the independent non-profit foundation Norwegian Energy Partners (Norwep). In that role, he built strong relationships with the global offshore wind industry across South Korea, Japan, Taiwan, the Philippines, Vietnam, and Australia. His last day at Norwep will be December 31, 2024.
Before joining Norwep, Mr. Ellingsen held several key roles in the global offshore industry. Notably, he served as Group Executive Director for Ferguson Group Ltd, where he oversaw its global container and modular business and established its Singapore operations in 2008. He also founded Norway-based Ferdocean AS in 2018, which was sold in 2022. Following the sale, he was appointed Non-Executive Director of Ferdocean AS, where he provided strategic operational oversight of the business.
Mr. Ellingsen holds certifications in Business Sustainability Management from the University of Cambridge, Leadership and Competence Development for Board and Committee Members from the University of Stavanger, and in Foundation Program in Business Administration from the BI Norwegian School of Management. Additionally, he is a certified ISO 9001, 14001, and 27001 Lead Auditor through the Knowledge Academy.
Mr. Ellingsen’s appointment comes amid the growing commercialization of floating renewable energy projects, which are moving further offshore to deeper waters, driving demand for advanced mooring solutions such as anchoring techniques and synthetic mooring lines.
Floating wind farm developers require an innovative partner with a reliable network of suppliers and manufacturing capabilities to reduce costs and address supply chain challenges. This presents Mooreast with a strong opportunity to offer its cutting-edge mooring solutions.
Mooreast said it would leverage Mr. Ellingsen’s extensive expertise and network within the offshore wind industry to capture business opportunities as the Group positions itself as a key player in the global floating offshore wind market.
Commenting on the appointment, Mr. Sim Koon Lam said, “We are delighted to welcome Mr. Ellingsen to the team; his experience, strong track record, and deep industry knowledge and network will further accelerate our push towards the floating offshore renewable sector. We are confident he will strengthen our strategic direction, propel the Group to the next level, and deliver long-term value to our shareholders.”
Mr. Eirik Ellingsen said, “I am deeply honored and excited to take on the role of CEO at Mooreast. I look forward to working with the Mooreast team to implement key transformation strategies to build momentum and achieve the Group’s long-term vision of becoming the leading mooring solutions provider within the floating renewable energy sector.”
Leveraging more than 30 years of mooring and offshore marine expertise, Mooreast total mooring solutions include the design, engineering, and fabrication of specialist anchors and equipment, as well as geotechnical and geophysical studies such as soil data analysis to determine project feasibility and engineering design for mooring configuration for floating wind turbines. The Group also incorporated Mooreast Taiwan in May 2024 and Mooreast Malaysia in July 2024.