The project will be performed within the Joint Venture agreement between MMT and Reach Subsea utilizing the vessel Edda Fonn.
The pipeline transports gas from Algeria to Spain and crosses the Mediterranean at a maximum depth of 2.155 meters of water.
The inspection work will be performed in February 2017.
The project is important for MMT and Reach and demonstrates that their significant investments in personnel and technology for pipeline inspection projects have been successful.