KENC’s scope includes the design and engineering of the seafastening for the OHVS substructures. The steel jackets, each weighing 3,700 metric tons and standing approximately 33 meters tall. During transport, these jackets will be positioned vertically on a barge. The lower and upper grillage system, designed and engineered by KENC, will provide crucial support for the jackets during the transition.
Eric Buining, Managing Director of KENC Engineering, expressed enthusiasm, “We are excited to be part of this offshore wind farm project. We are proud to contribute to large-scale initiatives like this, and we look forward to working on this project.”
The engineering work is scheduled for delivery in November 2024.