The new unit, based on the VARD 4 19 design, will be delivered in the second quarter of 2027 from Vard’s shipyard in Vung Tau, Vietnam. Tailor-made to support offshore wind farm operations, this vessel will be the sixth CSOV that Vard has delivered to Norwind Offshore, in addition to an Energy Construction Vessel and the conversion of a Platform Supply Vessel (PSV) to a Service Operation Vessel (SOV).
The 85-meter-long vessel, with a beam of 19.5 meters, will be equipped with advanced technological systems, including a height-adjustable motion-compensated gangway with an elevator system, a 3D crane, and a height-adjustable boat landing system, ensuring superior operability and logistical efficiency. The vessel will also feature advanced battery solutions, emphasizing Vard’s commitment to sustainable operations. Capable of accommodating 87 personnel, the vessel is designed for both safety and comfort, creating a highly efficient working environment for global offshore wind farm activities.
Pierroberto Folgiero, CEO and Managing Director of Fincantieri, commented: “We are proud to strengthen our partnership with Norwind Offshore and Navigare Capital Partners through this contract. It underscores Fincantieri’s commitment to sustainable innovations in the offshore wind sector, an area where we continue to invest and excel. The advanced technology and tailor-made solutions embedded in this vessel highlight our dedication to operational efficiency and environmental responsibility, which are crucial elements as we contribute to the global energy transition.”