DOF Group Secures Vessel Contracts with Subsea 7 and Maersk

(Image credit: DOF Group)

DOF Group is pleased to announce a contract with Subsea7 for a Time Charter of Skandi Acergy, adding a minimum of 18 months firm backlog, at a value in the range $85–105 million, to the Group. Commencement is expected to be Q1 2025 after the vessels current commitments.

Skandi Acergy is a 2008 built large construction vessel equipped with a 400-ton crane and 2000m2 deck and have installed two ROV systems that DOF will operate under the contract.

DOF Group is further pleased to announce an agreement with Maersk Supply Service to charter in Maersk Installer on a two-year firm Time Charter with options thereafter. Commencement is scheduled for end of Q1 2024.

Maersk Installer is a state-of-the-art large construction vessel. The vessel was delivered in 2017 and is amongst the newest and most modern subsea vessels on the market, it’s equipped with 1 x 400-ton AHC crane and 1 x 100-ton AHC crane to give maximum flexibility for utilizing the large, 1850 m2 deck. With DP3, SPS and designed for maximum efficiency, reliability, and redundancy DOF view the vessel as a perfectly fit into the DOF Group Fleet and look forward to offering the vessel to Clients world-wide.

 

Latest Issue:

The ocean sector is fully immersed in a fundamental paradigm shift, with advances in Uncrewed Vehicles & Marine Robotics giving…

Your cON&Tent matters. Make it count.

Send us your latest corporate news, blogs or press releases.

Search