The three-month deepwater OBN survey at B20/11 covering the Golfinho and Cameia fields, will utilize the Shearwater OBN platform comprising of the Pearl node and the company’s fit for purpose dual ROV-equipped SW Tasman. The SW Gallien will be acting as source vessel and the project will be in direct continuation of the previously announced project.
Shearwater CEO Irene Waage Basili commented, “These consecutive projects underline the strength of our long-term strategy and add to the already impressive utilization of the Shearwater OBN platform. We are reshaping ocean-bottom seismic in West Africa, breaking through the industry’s quality and cost curves as leading OBN technology is adopted.”