The cable ship will be built at Colombo Dockyard in Sri Lanka, with scheduled delivery in Q4 2029.
Designed specifically for fiber optic submarine cable repair operations, this new build represents a significant investment in the future of Global Marine Group’s fleet and the markets we serve.
Based on a proven next-generation vessel design, the new build will deliver enhanced operational performance while setting new standards in efficiency and sustainability. It marks the first step in a planned and phased renewal of the company’s fleet, introducing a modern, hybrid-powered platform optimized for subsea cable maintenance.
Built for Performance and Sustainability
The new vessel has been engineered with a strong focus on station-keeping capability and reduced fuel consumption.
Key features include:
- Hybrid power generation, combining generators and battery systems to enhance operational efficiency and resilience
- Optimized fuel consumption, using advanced engine configurations to match power output to operating conditions
- Azimuth thruster technology, delivering maximum propulsion efficiency and maneuverability
- A hydrodynamically optimized hull, improving transit efficiency and performance in challenging sea states
- Shore power connectivity, enabling reduced emissions during standby periods
- Advanced emissions reduction systems, supporting compliance with CLEANSHIP requirements and future regulatory standards
Together, these capabilities deliver meaningful reductions in CO2 and NOx emissions, alongside improved operational reliability.
Simon Hibberd, Chief Executive Officer, Global Marine Group, said: “This new build is about investing ahead of demand. It ensures Global Marine has the capability, capacity, and efficiency required to support the next generation of subsea cable networks while reinforcing our position as the market-leading provider of maintenance services worldwide.
“We are delighted to be partnering with Colombo Dockyard on this important project and look forward to welcoming the vessel into service in 2029.”
Supporting Long-Term Growth
This new build, alongside the recent acquisition of CS Clipper, represents a significant renewal of the company’s operational fleet. It strengthens Global Marine Group’s ability to support long-term maintenance contracts with the world’s leading cable owners, while positioning us to capitalize on the growing demand in the subsea cable market.
As the industry enters a phase of structural expansion and tighter environmental regulation, investing in modern, fuel-efficient vessels ensures we remain competitive, resilient, and ready to meet future challenges.
Designed for the Future
With cutting-edge hydrodynamic design and a specification tailored to Global Marine Group’s exact operational requirements, this vessel will be built for long-term performance, delivering strong sea-keeping capabilities and full lifecycle value.
In a market with increasing demand, this investment puts us in a strong position to win and retain work in the years ahead.